Lakeside Addition 9 – Floor and Exterior Walls
Addition framing continues with laying of the sub-floor and erection of the outside walls.
Addition framing continues with laying of the sub-floor and erection of the outside walls.
The Lake Becky house needs a number of improvements. Rather than piecemeal them together, we decided to hire a contractor to make them and build an addition with a large studio, and master suite.