Lakeside Addition – Materials Delays
Aug 17th, 2021BriBlog, Huppstead
bath fixtures, construction materials shortages, Lowes delivery delays, metal roofing
Electrical, plumbing, telecommunication wiring/conduit, and HVAC line set rough-ins. County rough-in inspection passed.
Lakeside Addition – The Dog Days
Aug 14th, 2021BriBlog, Huppstead
Home Depot delivery damage, roof leaks
Gratuitous whining about various struggles from the end of June through late July.
Lakeside Addition – Windows at Last!
Jun 26th, 2021BriBlog, Huppstead
building materials, manufacturing wait times, window backorder
The new windows (at least most of them) were delivered and installed.
Lakeside Addition – House Renovation
Jun 22nd, 2021BriBlog, Huppstead
renovation
Renovation of the existing house walls and floors
Lakeside Addition – Demolition
Jun 19th, 2021BriBlog, Huppstead
demolition, masonite siding, particle board, roof support
With the framing of the addition complete, it was time to tackle demolition of the old house. As the demolition proceeded, the need for more and more demolition was revealed until very little remained of...
Station Cove Falls
Jun 13th, 2021BriBlog, Whatshupp
Oconee Station, Palmetto Trail, Station Cove Falls
Sunday afternoon stroll to Oconee Station Cove Falls
Lakeside Addition 11 – Addition Roof Framing
Jun 9th, 2021BriBlog, Huppstead
roof framing
Roof framing for the addition was mostly completed. Still needs to be tied in with existing house roof frame.
Lakeside Addition 10 – Interior Wall Framing
Jun 9th, 2021BriBlog, Huppstead
wall framing
Today, the walls for the addition were completed with the sheathing and wrapping of the exterior walls, and the framing of the interior walls.
Lakeside Addition 9 – Floor and Exterior Walls
Jun 8th, 2021BriBlog, Huppstead
Signature Homes, Signature Homes Construction, wall framing
Addition framing continues with laying of the sub-floor and erection of the outside walls.
Lakeside Addition 8 – Basement Wall Framing
Jun 6th, 2021BriBlog, Huppstead
wall framing, wood frame walls
Framing of the basement wood-framed walls.
Lakeside Addition 7 – Foundation Complete!
Jun 6th, 2021BriBlog, Huppstead
concrete block waterproofing, concrete foundation, foundation, foundation waterproofing, Signature Homes Construction, waterproofing
With the concrete poured, finished, and cured, the foundation is complete. Framing of the addition can now begin.
Lakeside Addition 6 – Pour Prep
Jun 3rd, 2021BriBlog, Huppstead
lakeside addition, Signature Homes Construction
Today the final preparation for the pouring of the concrete was completed.